[featured_image]
Download
Download is available until [expire_date]
  • Version
  • Download 98
  • File Size 286.95 KB
  • File Count 1
  • Create Date March 25, 2022
  • Last Updated March 25, 2022

D2.1 Battery Pack Functional Requirements and KPIs - Full report

This deliverable includes:
  • A definition of key performance indicators (KPIs) to be monitored during the project. To facilitate their understanding, they are split into different categories related to the expected impacts from the call and thus with the specific objectives of MARBEL project. When necessary, a calculation method is proposed.
  • A definition of functional requirements to be considered for every subsystem within the project.
The document is a concise reference source for all consortium members.